As part of the Toshka project, the land reclamation of 170,000 acres was planned within the overall target of 400,000 acres. The project involved land leveling, the establishment of a road network, and the installation of a 70-kilometer water pipe network with diameters ranging from 250 mm to 1,400 mm.

Additionally, water stations were established to supply water to the irrigation networks, and mechanical and electrical work, such as pumps and generators, was carried out.

Given the extensive coverage area, modern equipment and technologies were employed to ensure optimal results. Simultaneous operation of multiple crews and equipment was necessary to ensure project efficiency and adherence to best practices.